①Heating transfer oil boiler FREE design, no need extra installation and easy to move to other work site.
②Burner tube + Heating transfer oil dual heat system can improve the heating efficiency and reduce bitumen residue in the drum, the tank body insulated with 50mm fiber glass.
③Hydraulic drum loading and feeding system to make the efficiency and safey for operation.
④Wide adaptability: suitable for variety of bitumen drum.
⑤Good dewatering: the use of large displacement asphalt pump for internal circulation, so that water vapor overflow, naturally discharged from the exhaust port
⑥Safe and reliable: Heat conduction oil heating equipment adopts automatic control system, imported auto-ignition burner, can realize automatic control according to oil temperature, and equipped with corresponding monitoring instruments.
Main specification
Model | DJT4 | DJT8 |
Dimension (LXGXW) mm | 7500x2100x2600 | 8300X2100X2600 |
Productivity (t/h, temperature ≥25℃) | 2-3 | 4-5 |
Bitumen temperature (℃) | 130-160 | 130-160 |
Drum load quantity | 20 | 41 |
Bitumen storage capacity | 10 | 15 |
Burner Model | Riello G20 x2 | Riello G20 X2 |
Fuel consumption (L/H) | 11-18 | 11-18 |
Heating oil temperature ( ℃) | 210-240 | 21-240 |
Heating oil grade | 320 | 320 |
Gross weight (t) | 6 | 10 |